Main High Voltage Substation

Main High Voltage Substation

Completed:

2015

Surface Area:

6.6 tonnes

Location:

Baralaba, Queensland

SCOPE

High Voltage Substation - Length: 13.9m, Width: 4.7m, Height: 3.2m

 

The 6.6 tonnes of Structural Steel provided in the high voltage substation was hot dipped galvanised. Built at our Murarrie workshop, lifted and transported to site in Central Queensland then fully commissioned.